Tracker · Pre-application
General Atomics Electromagnetic Systems
The NRC page does not include a project overview paragraph.
- Who
- Not stated
- Design
- Not stated
- Reactor type
- High Temperature Gas Reactors
- Status
- Active on the NRC index
- What
- Not stated
- When
- Not stated
- Site
- Not stated on the NRC page in this snapshot.
- NRC page reviewed
- Tuesday, September 15, 2026
Dockets
Status timeline
Dates are printed as the NRC page prints them, including the actual (A) or target (T) mark.
The NRC page in this snapshot does not list a milestone table.
NRC activity table
| Product | Type | Reference | Status |
|---|---|---|---|
| Fast Modular Reactor Principal Design Criteria | Topical Report | ML22154A555 | Feedback ProvidedML23215A266 |
| Fuel Qualification Plan of the Fast Modular Reactor | White Paper | ML23032A477 | Feedback ProvidedML23355A200 |
| Fast Modular Reactor Quality Assurance Program Description | Topical Report | ML23212B187 | Under Review |
| Fast Modular Reactor Source Term Methodology | White Paper | ML23317A090 | Feedback ProvidedML24277A278 |
| Fast Modular Reactor Selection of Licensing Basis Events | White Paper | ML24011A221 | Feedback ProvidedML24164A091 |
| Fast Modular Reactor Safety Classification of Structures, Systems, and Components | White Paper | ML24162A320 | Feedback Provided ML24262A233 |
| Fast Modular Reactor Safety Approach and Probabilistic Risk Insights | White Paper | ML24234A329 | Under Review |
Related Federal Register notices
Included when a notice shares a docket printed on the NRC page, or when the notice title repeats the project or design name. Other NRC notices are left out.
No in-scope Federal Register notice is linked to this project.